More
Language
Display mode
Sampson Boat Covideo
July 28, 2018 · 23 min · 428K views · Port Townsend
What this video covers
Restoration of the 108-year-old yacht Tally Ho requires full-scale lofting to correct hull deformation and facilitate the installation of new frames.▶ 0:13 To achieve the necessary flexibility for reframing, the crew removes hull planks, labeling each for potential reuse or repurposing as interior joinery.▶ 7:39 The process involves leveling the hull to its original lines using jacks under the keel to ensure new frames are installed perpendicular to the baseline.▶ 4:53 For the new double-sawn frames, the builder uses live oak, selecting pieces with grain that follows the template curve while avoiding structural defects.▶ 11:46 After roughing out the futtocks with a Georgia ship saw—a heavy-duty sawzall mounted to a gearbox—the pieces are planed and cut to final shape.▶ 14:52 The builder applies raw linseed oil to the new timber to minimize checking and distortion during the drying process.▶ 17:12 Despite traditional concerns regarding sapwood, the builder utilizes live oak sapwood due to its density and rot resistance.▶ 18:03
More from Sampson Boat Co
From Sampson Boat Co — see the channel’s boat, crew, and every analyzed video.