RAN Sailingvideo

Fibreglassing in winter was way easier - Ep. 403 RAN Sailing

26 July 2024 · 22 min · 120K views · Skåne

What this video covers

Laminating the interior hull of a strip-planked boat requires precise temperature management to prevent air bubbles caused by wood off-gassing. During a summer project, high ambient temperatures caused significant air entrapment beneath the fibreglass, forcing the crew to use a syringe to inject epoxy into voids after the initial cure.9:52 Data logging revealed that rising temperatures throughout the afternoon triggered the off-gassing; starting the lamination process later in the evening, when temperatures trend downward, eliminated the issue.14:22 Folding the 1270mm-wide fibreglass cloth in half improved reach and allowed for more consistent roller pressure, though it required careful handling to prevent the heavy material from sliding during application.2:55 The crew determined that a primer layer of epoxy on the cedar hull is unnecessary, as the wood does not wick excessive resin from the laminate.17:00 Working in cooler conditions and maintaining a "wet-on-wet" application process significantly improved the quality and speed of the lamination.20:44

Watch on YouTube

More from RAN Sailing

Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran SailingSept 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sept 2026This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue