See me at seavideo
Hauling out! Three weeks at the boatyard - Part 1
15 June 2025 · 20 min · 2K views
What this video covers
Nova Loman hauls her boat out for a three-week yard period to address deck leaks and structural damage around the stanchions and toe rail.▶ 0:00 After removing the toe rail, she discovers fiberglass cracks and loose stanchion bases, which she repairs by drilling out damaged areas and filling them with epoxy.▶ 7:24 She also removes and reseals the navigation light cabling that previously ran through poorly sealed deck penetrations.▶ 1:39 During the process, she repairs a broken section of the toe rail by gluing the fractured pieces back together.▶ 12:10 Separately, she troubleshoots a failed refrigeration unit, suspecting a fault in the compressor’s electrical control box rather than a refrigerant leak, and sends the component to a technician for testing.▶ 14:50 The project concludes with the reinstallation of the navigation light cables and the stanchions.▶ 16:46 Structural repairs on fiberglass decks require thorough cleaning and epoxy reinforcement to ensure long-term integrity when re-bedding hardware.
More from See me at sea
From See me at sea — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



