Sampson Boat Covideo

Building TALLY HO's rig - a complex process!

6 January 2024 · 22 min · 466K views

What this video covers

Fabricating the standing and running rigging for the 1910 gaff cutter Tally Ho requires a detailed load study to determine shroud dimensions based on creep rather than traditional strength-based calculations.4:01 By using synthetic Dyneema line instead of galvanised iron, the project achieves a 75% weight reduction aloft while maintaining structural integrity.5:12 Riggers at Brian Toss Rigging perform a Mobius Brummel splice on the Dyneema, followed by a strategic taper of the tail to prevent stress risers.14:49 Each shroud is then tensioned on a 48-foot hydraulic stretching bench to set the splice and measure elongation.18:46 To protect the synthetic material and provide a traditional aesthetic, the crew applies a serving of marlin using a serving mallet, which is then coated with a pine tar and varnish mixture.5:48 This serving method allows for easier inspection and repair compared to chafe sleeves.9:14 The process concludes with leathering gaff span eyes using a baseball stitch with blunted needles.1:24

Watch on YouTube

More from Sampson Boat Co

Sailing through the "Needles"Oct 2026Sailing the British South coast!Sept 2026Tally Ho meets a tidal mud-berth!Sept 2026Tally Ho sails into England after 59 years overseas!Aug 2026

From Sampson Boat Co — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue