Sailing Big Lostvideo
Another Bad Week In The Shipyard
27 May 2025 · 36 min · 9K views · Dania Beach
What this video covers
Connor and crew aboard Big Lost spent a second consecutive bad week at Harbortown marina in Florida after the marina's general manager, Logan, reversed an earlier commitment by manager Will to cover damage caused when a travel lift operator snapped the port sail drive and prop during haulout.11:23 Connor had provided the factory sling-placement diagram, marked the toe rail with tape, and verbally briefed the lift operator — who spoke little English and never responded — before the boat was lifted prematurely, driving the prop up into the hull.14:42 In the subsequent meeting, Logan claimed yard staff had held multiple conversations with Connor about strap placement; Connor disputed this as a falsification of the incident report and asked Logan to review marina security camera footage, an offer Logan declined.16:30 The marina's settlement offer — covering roughly $2,500 in yard fees in exchange for a two-and-a-half-page liability release requiring Connor to accept full fault and stay silent publicly — was rejected.21:15 Connor and crew paid the yard fees, refused to sign, and splashed Big Lost the same day the replacement prop cleared customs and was installed by Just Catamarans.22:01 A separate warranty delay on an air conditioning unit, shipped from Italy with no confirmed arrival date, extended the stay in 90-degree Florida heat.29:12 Documenting the sling-placement diagram and marking strap positions on the hull did not prevent damage when the lift operator ignored verbal instructions and lifted without confirmation.
More from Sailing Big Lost
From Sailing Big Lost — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



