Entre Terras e Maresvideo

FINALLY! WE FINISHED THE STRUCTURE OF THE T1 DRIVESHAFT TUNNEL SUPPORT. ep137 video 2

29 September 2024 · 24 min · 807 views

What this video covers

Edgar and his crew reinforce the propeller shaft tunnel on their boat by laminating multiple layers of fibreglass to achieve structural integrity.13:54 After initial attempts resulted in air bubbles and wasted material, the team adopted a three-stage lamination process, applying one layer per day to ensure proper curing.6:28 They filled deep voids with solid fibreglass scraps and a mixture of resin and fibre powder before applying structural layers, which include biaxial fabric and 800-gram woven roving.2:55 The finished tunnel wall measures approximately 5 to 6 millimetres thick, consisting of at least eight layers of 800-gram fabric plus additional manta and 330-gram cloth.21:26 To manage the difficulty of laminating heavy fabric overhead, the crew uses a resin and fibre powder paste between layers to secure the material.16:27 The completed structure now accommodates the mechanical seal with the required clearance.22:14 The team plans to finish the surface with epoxy fairing compound before installing the shaft support bearing and homokinetic joint.23:45

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue