RAN Sailingvideo

Shroud Loads Are Brutal: This Is How We Handle Them - Ep. 444 RAN Sailing

6 June 2025 · 30 min · 127K views · Skåne

What this video covers

Johan and Malin reinforce the hull of their custom boat to support the D1 lower shrouds, which they are relocating from the coaming to the coach roof to clear the side decks.7:08 This change increases the compression load on the mast and the tension on the rigging, requiring a structural semi-bulkhead to transfer forces into the hull.7:55 They construct this bulkhead using a Sapele core sandwiched between layers of unidirectional carbon fibre, designed to distribute loads over a wide surface area.11:16 To secure the chain plates, they use 10mm-thick stainless steel flat bars clamped with 10 M20 bolts, opting for a visible, industrial aesthetic over a flush-mounted recess.15:43 Johan manages the exothermic reaction of deep epoxy pours in the bolt holes by using water-filled bags as heat sinks.20:42 The final assembly includes massive 125mm fillets to ensure a robust transition between the bulkhead and the hull.26:25 Overbuilding the structure ensures long-term durability against dynamic rig loads.28:09

Watch on YouTube

More from RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502Sept 2026This Is Where Boat Builds Break People - Ep. 501 Ran SailingAug 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran SailingAug 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran SailingAug 2026

From RAN Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue