The Marinervideo

Job Done & Now The Low.

3 July 2025 · 11 min · 4K views

What this video covers

Chris completes a 10-day maintenance period on his boat, focusing on structural integrity and underwater systems before an upcoming passage.0:06 He torqued the 25 keel bolts to 650 newton metres after discovering some were loose, specifically noting that two had been held only by plastic washers.4:34 Below the waterline, he applied new antifouling paint and visually inspected the hull.4:01 He cleaned and treated the nitronic rigging couplings on the mast with a petroleum-free lubricant suitable for carbon fibre, reinstalled the antenna to restore AIS and VHF functionality, and secured the self-tacking anemometer.5:42 Despite these repairs, the mast remains bent due to insufficient rigging tension, and the gooseneck and vang require further servicing.4:45 The project cost $19,000 and involved significant labour that remains largely invisible.0:48 To prepare for departure, he plans to rig the headsails, load provisions, and mount the mainsail, prioritising these tasks to ensure the vessel is seaworthy for the Atlantic crossing and the subsequent Fastnet race.7:22

Watch on YouTube

More from The Mariner

Sailing to Newport, my Trimaran Project & Notes on Archive Management for L- Matrix AI'sJul 2026Taking a Look Around the Waterfront in Lunenburg, Nova ScotiaJun 2026Solo Docking an 80ft Yacht Without Use Of The Auxillary EngineMay 2026Introducing Longitudinal AI SystemsMay 2026

From The Mariner — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue