Sven Yrvindvideo

24 Sep 2024 Adapting for NZ

23 September 2024 · 7 min · 25K views · New Zealand

What this video covers

Irwin modifies his boat to increase stability and interior space for a planned voyage to New Zealand. He removes 90.2 kilograms of internal lead ballast, which he intends to replace with 150 kilograms of ballast mounted externally and lower on the hull to lower the centre of gravity.3:09 To improve buoyancy during a potential capsize, he plans to raise the deckhouse roof by 10 centimetres.6:10 Interior structural changes include moving a bulkhead back 20 centimetres to extend the bed length to 192 centimetres and raising the bed platform by 20 centimetres to create additional storage space for food and water.4:57 He also removes an oversized, inefficient ventilation system that previously allowed water collection.0:27 The refit incorporates design lessons learned from a previous plywood boat, specifically regarding ventilation, cleat placement, and storage capacity.5:36 These modifications aim to improve both the vessel's righting moment and the habitability of the living quarters.

Watch on YouTube

More from Sven Yrvind

Four Sheets of Divinycell for the Hull Sides – I Think That's Enough.Oct 2026Nervously Cutting the Divinycell Sheets.Oct 2026Trying to Get the Sheerline Right.Oct 2026More molds up.Oct 2026

From Sven Yrvind — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue